Published On Jul 18, 2019
https://www.covertecproducts.com/prod...
How Long Should Concrete Stain Dry Before Sealing?
A high quality concrete stain should dry in 15 - 60 minutes, like ColorStain UV does. Shortly after this, you can seal the concrete surface. With that said, not all stains are created equal.
Acidic or polymer-based products can take hours to dry, and still need additional wor before you can seal or add a top coat to the concrete.
Some best practices to follow when sealing your concrete are:
- Make sure the concrete has cured at least five days before applying a color stain on it.
- Make sure all - or a large amount - of the moisture is out of the concrete before staining so it so it can absorb into the substrate.
- Make sure that the color stain is soaked in, absorbed, and it won't rub off - before you seal it.
CoverTec Products
10821 NW 50th Street, Sunrise, FL 33351
5PP4+M3 Sunrise, FL, USA
(754) 223-2465
covertecproducts.com
26.186530
-80.284040
https://covertec-products.business.si...
For more information, click here: https://www.covertecproducts.com/prod...