Decline Rehab: Hard Rock Gold Mining Episode 8
2,230 views
0

 Published On Aug 16, 2022

This was an exhausting but satisfying day of work. The other half of the day should be seen in Episode 10.

I estimate half a yard of material needs to be spread, at which point the decline is passable to equipment all the way to the water level and we can begin emptying muck bays. The generator's new temporary tank is plumbed in, and its batteries are charging. Ventilation will follow. There is a strong possibility that we will finish drilling the pattern at the 130 level and get our first development shot out of the way shortly afterwards!