Demolition time-lapse with closeups of a former TV studio building (Part 1)
Hotel Demolition Hotel Demolition
4.09K subscribers
95,511 views
0

 Published On Feb 25, 2020

69 days of #demolition of a concrete building (old TV studio) compressed into a 30-minute #timelapse with various closeups and sub-timelapses scattered throughout. This is part 1, in which the above-ground portions are torn down, covering September 30 through December 7, 2019. The demolition proceeds from back to front, and since our cameras are facing the front, some of the early demolition is not visible, although we take a few strolls back there to check it out. During those strolls, and in some later shots, there are closeups of the high reach #excavator doing its thing.

Elsewhere on this channel is part 2, in which the below-ground floors and the foundation are excavated, and the rubble from this part is taken away. That video is here:    • Demolition time-lapse with closeups o...  

This demolition has nothing to do with the original hotel demolition that this channel originally extensively covered, but it still seemed appropriate for this channel anyway, and was only a block away. This demolition takes place in central San Francisco.

show more

Share/Embed